Civil Law And Termination Of Obligations Rescission And Dissolution In Uae .

1. Introduction

Termination of obligations, rescission and dissolution are fundamental concepts of UAE civil law. They determine the circumstances in which contractual obligations come to an end, the rights of parties following termination, and the remedies available when contractual performance becomes impossible or one party breaches its obligations.

Under UAE law, a contractual relationship does not ordinarily disappear simply because one party wishes to withdraw from it. Termination must have a recognised legal basis, such as:

Mutual agreement between the parties.

Judicial rescission because of non-performance.

An agreed automatic termination clause.

Force majeure resulting in impossibility of performance.

Expiry or fulfilment of the contractual obligation.

Other statutory grounds for extinguishing obligations.

Important 2026 legislative development: Federal Decree-Law No. 25 of 2025 promulgating the new UAE Civil Transactions Law entered into force on 1 June 2026, replacing Federal Law No. 5 of 1985.

The current provisions on dissolution of contracts are principally contained in Articles 232–238 of the 2025 law. Earlier judicial decisions interpreting Articles 267–275 of the 1985 law remain relevant to understanding established principles, subject to compatibility with the new legislation.

LEXAI+2

 

2. Meaning of termination, rescission and dissolution

These expressions are related but do not always have identical legal consequences.

A. Termination of obligations

Termination of obligations refers to the legal extinction of an existing duty owed by one party to another.

Examples include:

Payment of a debt.

Completion of contractual performance.

Expiry of a contractual period.

Release of a debtor by a creditor.

Compensation or settlement where legally sufficient.

Impossibility of performance under applicable law.

Termination may affect an individual obligation without necessarily terminating the entire contract.

B. Rescission

Rescission generally refers to setting aside or undoing a contractual relationship because of a legally recognised ground.

For example, where a construction contractor seriously fails to perform contractual obligations, the employer may seek judicial rescission and appropriate compensation.

The consequences may include restitution of benefits received by the parties.

C. Dissolution

Dissolution refers more broadly to bringing a contractual relationship to an end.

It may arise through:

Mutual agreement.

Judicial intervention.

An agreed automatic termination mechanism.

Statutory operation of law.

The 2025 Civil Transactions Law uses the expression dissolution of the contract for its dedicated statutory section.

3. Legislative framework under UAE civil law

The principal current provisions are as follows:

Current provisionLegal subject
Article 232Binding force of valid contracts
Article 233Mutual rescission (Iqala)
Article 234Judicial rescission for non-performance
Article 235Automatic rescission clause
Article 236Effects of dissolution
Article 237Retention pending reciprocal restitution
Article 238Further statutory grounds concerning dissolution

These provisions form the principal contractual dissolution framework.

UAE Legislation+1

 

4. Article 232: Binding force of contracts

Article 232 establishes that a valid and binding contract cannot ordinarily be revoked, modified or rescinded by either party without:

Mutual consent.

Litigation or judicial intervention.

A provision of law permitting it.

This reflects the principle of Pacta Sunt Servanda — agreements must be respected and performed.

Legal implications

A party cannot terminate a binding contract merely because it has become commercially inconvenient.

Contractual rights remain enforceable until a recognised ground for dissolution arises.

Parties must respect agreed contractual obligations.

Courts may intervene where statutory requirements for rescission are established.

Example: A UAE company enters into a five-year commercial supply agreement. After two years, the company decides that the contract is no longer profitable. Mere commercial dissatisfaction does not automatically extinguish its contractual obligations.

5. Article 233: Mutual rescission (Iqala)

Mutual rescission, known in Islamic jurisprudential terminology as Iqala, occurs when both parties agree to reverse a previously concluded contract.

Article 233 recognises mutual rescission and subjects it to the general conditions governing contracts.

Essential requirements

The original contract must have been concluded.

Both parties must agree to rescind it.

The agreement must satisfy applicable contractual requirements.

The parties must address the return of the contractual benefits.

The statutory requirements for rescission of the whole or part of the subject matter must be satisfied.

Partial mutual rescission

The parties may agree to rescind only part of the subject matter in exchange for the corresponding consideration.

For example, a buyer purchases 100 commercial machines but subsequently agrees with the seller to return 30 machines for a proportionate refund.

Legal consequences

Article 233 distinguishes between the parties and third parties:

Between the original parties, mutual rescission has the effect of rescission.

In relation to third parties, it constitutes a new contract.

This distinction protects the legal interests of persons who may have acquired rights in the subject matter after the original transaction.

UAE Legislation+1

 

6. Article 234: Judicial rescission for non-performance

Article 234 governs rescission where one party fails to perform an obligation under a bilateral contract.

A bilateral contract creates reciprocal obligations. For example, a seller must deliver goods, while a buyer must pay the agreed price.

Requirements for judicial rescission

First: Existence of a valid contract

There must be a legally binding contractual relationship.

Second: Failure to perform

One party must fail to perform an obligation when it becomes due.

Third: Notice

The non-defaulting party must give notice to the defaulting party.

Fourth: Judicial request

The non-defaulting party may request the court to order performance or rescission.

Powers of the court

The court may:

Order immediate contractual performance.

Grant additional time where circumstances justify it.

Refuse rescission where the breach is of minor importance in relation to the overall obligation.

Refuse rescission where the debtor has averted it through performance.

Award compensation where justified.

Example

A developer agrees to construct a residential building within 24 months. The developer substantially fails to complete the project despite the contractual deadline and appropriate notice.

The purchaser may seek judicial rescission, restitution and compensation, subject to the contractual terms and statutory requirements.

Key provision

Article 234 balances contractual enforcement with fairness by allowing the court to consider the seriousness of the breach and whether the default has been remedied.

UAE Legislation+1

 

7. Article 235: Automatic rescission clauses

Article 235 recognises contractual arrangements under which a contract may be automatically rescinded upon non-performance without requiring a judicial judgment.

This is commonly known as an express resolutory condition or automatic termination clause.

Main features

The parties must agree to the relevant contractual mechanism.

The contract should clearly identify the circumstances triggering termination.

The clause must satisfy applicable statutory requirements.

Notice requirements must be considered.

The clause cannot override mandatory legal restrictions.

Example

A supplier agrees to deliver equipment by 30 September. The contract expressly provides that failure to deliver by that date will result in automatic rescission without a judicial judgment.

If the clause satisfies Article 235, the innocent party may rely on the agreed mechanism, subject to its precise wording and applicable notice requirements.

Difference between Articles 234 and 235

Article 234Article 235
Judicial rescissionContractually agreed automatic rescission
Notice to defaulting partyNotice governed by the statutory rule and agreement
Court decides whether rescission is justifiedExpress contractual mechanism governs
Court may grant additional timeNo ordinary judicial rescission order is required where the clause validly operates

UAE Legislation+1

8. Article 236: Force majeure and impossibility of performance

Article 236 deals with force majeure that makes contractual performance impossible.

It recognises three situations.

A. Complete impossibility

Where force majeure makes performance impossible, the corresponding obligations are extinguished and the contract is automatically rescinded.

Example: A contract concerns the delivery of a specifically identified asset that is destroyed by an unavoidable natural disaster before delivery, making performance impossible.

B. Partial impossibility

Where only part of the obligation becomes impossible, the corresponding obligation may be extinguished, or either party may request judicial rescission of the contract.

C. Temporary impossibility

Where temporary impossibility affects a continuing contract, either party may invoke the extinguishment of the corresponding obligation, seek modification of the contract or request judicial rescission.

UAE Legislation

Difference between force majeure and hardship

This distinction is particularly important.

Force majeure — Article 236Hardship — Article 224
Performance becomes impossiblePerformance becomes excessively onerous
Corresponding obligations are extinguishedObligations may be adjusted
Contract may be automatically rescindedCourt may modify or rescind
Impossibility is centralSerious threatened loss is central

Article 224 addresses exceptional general circumstances that could not have been foreseen when the contract was concluded and make performance excessively burdensome, threatening serious loss.

The court may reduce the onerous obligation to a reasonable level or order rescission. An agreement excluding this statutory protection is void.

UAE Legislation

 

9. Article 237: Restitution after termination

Article 237 establishes the principle of restoration of the parties to their previous positions.

When a contract is rescinded or terminated, the parties should generally be restored to the position they occupied before entering into the contract.

Examples

Example 1: Sale of goods

Buyer pays AED 100,000.

Seller delivers defective goods.

The contract is rescinded.

Buyer returns the goods.

Seller returns the purchase price.

Example 2: Investment agreement

Investor contributes AED 2 million.

Business partner fails to implement the agreed project.

Court orders rescission.

The investor may seek repayment, subject to deductions and other legally established entitlements.

Example 3: Construction contract

Employer makes advance payments.

Contractor fails to perform.

Court rescinds the agreement.

Accounts must be adjusted to determine the amounts to be returned and any compensation due.

Where restoration in kind is impossible, compensation may be awarded.

10. Article 238: Right to withhold reciprocal restitution

Article 238 protects parties where both have obligations to return benefits following dissolution.

It provides that a party required to return something received under a dissolved contract may withhold it until the other party:

Returns what it received; or

Provides an appropriate guarantee for its return.

This is a form of reciprocal restitution protection.

Example: A buyer must return machinery following rescission, while the seller must refund the purchase price. The buyer may withhold the machinery until the seller refunds the price or provides the required guarantee.

The provision helps prevent one party from being exposed to the risk of returning its benefit without receiving the corresponding restitution.

UAE Legislation

 

11. Other grounds for extinction of obligations

Termination of obligations is broader than contractual rescission.

The UAE Civil Transactions Law recognises several additional mechanisms.

A. Performance

An obligation ordinarily comes to an end when it is properly performed.

Example: A debtor pays the full outstanding amount to the creditor.

B. Release or remission of debt

A creditor may release a debtor from an obligation through a legally effective waiver.

C. Set-off

Where two persons owe reciprocal debts satisfying the applicable legal requirements, the debts may be extinguished against each other to the extent of their overlap.

D. Merger of creditor and debtor status

An obligation may cease where the qualities of creditor and debtor become united in the same person, subject to applicable statutory rules.

E. Impossibility

Where performance becomes legally or factually impossible under the relevant statutory conditions, the corresponding obligation may be extinguished.

F. Expiry and statutory grounds

Certain continuing contractual relationships end upon expiry of their agreed duration or upon the occurrence of a legally recognised terminating event.

The applicable rules depend on the particular contract and any special legislation.

12. At least eight important UAE case laws

The following cases are particularly relevant to rescission, contractual dissolution, restitution and termination.

The cases decided under the former 1985 Civil Transactions Law are historical authorities. Their principles should be tested against Articles 232–238 of the current law.

Case 1. Ras Al Khaimah Court of Cassation — Commercial Appeal No. 11 of Judicial Year 16

Judgment dated 28 March 2021

Subject: Rescission for non-performance and restitution.

The dispute involved an agreement for the supply of medical respirator masks during the COVID-19 period.

The buyer claimed repayment for goods that had not been delivered and sought rescission-related remedies.

The Court considered the contractual arrangements, the parties' conduct and the expert evidence concerning performance.

Legal principles:

Contracts must be performed in good faith.

Failure to perform may justify rescission.

The sufficiency of the grounds for rescission is a factual matter for the trial court.

The party seeking rescission must also be assessed in relation to its own contractual conduct.

Rescission generally requires restoration of the parties' former positions.

Compensation may be appropriate if restoration is impossible.

Importance: This decision illustrates the relationship between breach, judicial rescission and restitution.

Case 2. Dubai Court of Cassation — General Assembly Appeal No. 5 of 2021

Judgment dated 20 April 2021

Subject: Binding force of contracts and rescission of property transactions.

The dispute concerned a real-estate transaction involving unfinished infrastructure.

The Court examined the contractual terms and whether the purchaser could seek rescission based on the condition of the development.

Legal principles:

A valid contract binds the parties.

Clear contractual terms must be respected.

Rescission requires a legally recognised ground.

A party cannot disregard contractual obligations merely because the transaction becomes commercially inconvenient.

Contractual interpretation must respect the parties' common intention.

Importance: This judgment demonstrates the importance of contractual certainty and the restrictions on unilateral termination.

Case 3. Abu Dhabi Court of Cassation — General Assembly Commercial Request No. 1 of 2024

Decision dated 20 March 2024

Subject: Rescission of partnership agreements and repayment of investment funds.

The dispute involved a substantial investment in medical-centre development projects.

An investor had contributed AED 30 million under partnership arrangements but alleged that the agreed business structure had not been implemented.

The court considered the partnership documents, financial contributions and expert findings.

The General Assembly upheld the rescission-related findings and addressed the calculation of the investor's repayment, including amounts already received as profits.

Legal principles:

Non-performance of significant partnership obligations may justify rescission.

The parties should generally be restored to their previous financial positions.

Amounts already received must be considered when calculating restitution.

Expert evidence may be important in establishing the extent of non-performance and the appropriate financial consequences.

Importance: This is particularly relevant to commercial partnership dissolution and investment recovery.

Polaris Legal Library

 

Case 4. Dubai Court of Cassation — Appeal No. 469 of 2021

Subject: Automatic contractual termination and express resolutory clauses.

The decision concerned the distinction between automatic termination under former Article 271 and judicial rescission under former Article 272.

The Court's approach was that a clause intended to terminate a contract without judicial intervention must clearly express that consequence.

A clause that merely provides a termination right while leaving room for judicial assessment may not satisfy the requirements for automatic termination.

Legal principles:

Automatic termination must be based on sufficiently clear contractual wording.

The distinction between automatic and judicial rescission is important.

Notice requirements must be considered.

The defaulting party may have an opportunity to remedy the breach before a final judicial order under the judicial rescission mechanism.

Importance: This authority is especially useful when drafting commercial termination clauses.

Case 5. Abu Dhabi Court of Cassation — Appeal No. 261 of 2013

Subject: Judicial rescission and opportunity to remedy contractual non-performance.

The decision is cited in subsequent DIFC judicial discussion of former Article 272.

The relevant principle concerns the court's power to assess whether a breach justifies rescission and whether the defaulting party has remedied the non-performance before the final judicial decision.

Legal principles:

Judicial rescission is distinct from contractual automatic termination.

The court must examine the circumstances of non-performance.

Performance or cure before the final decision may affect the availability of rescission.

Compensation may accompany rescission where legally justified.

Importance: This decision illustrates judicial control over the termination of bilateral contracts.

Case 6. Dubai Court of Cassation — General Assembly Appeals Nos. 2 and 3 of 2020

Subject: Mutual dissolution and third-party rights.

The General Assembly considered issues involving property transactions and the legal consequences of mutual dissolution.

The decision is associated with former Articles 268–270 concerning mutual revocation and the distinction between the effects of dissolution on the original parties and third parties.

Legal principles:

Mutual dissolution requires agreement.

Dissolution operates as rescission between the original parties.

It may constitute a new transaction in relation to third parties.

The rights of third parties must be considered when determining the consequences of dissolution.

Importance: This judgment is useful in property transactions, commercial transfers and agreements involving subsequent purchasers.

Case 7. DIFC Court of Appeal — DIFC Investments LLC v Mohammed Akbar Mohammed Zia [2017] DIFC CA 005

Judgment dated 2017

Subject: Contractual termination for non-payment.

The Court considered the distinction between termination under an agreed contractual clause and judicial cancellation under former Article 272 of the UAE Civil Transactions Law.

The dispute involved contractual provisions permitting termination for failure to pay by the due date.

Legal principles:

An express contractual termination mechanism may operate without a judicial rescission order.

The wording of the termination clause is important.

Judicial cancellation under former Article 272 is distinct from automatic termination.

The parties' agreement must be examined to determine the applicable mechanism.

Importance: This is an important comparative authority for understanding the relationship between UAE civil-law termination provisions and DIFC contractual interpretation.

DIFC Courts

 

Case 8. Access Group DWC LLC and Proex Partners Limited v BLS International FZE [2023] DIFC CFI 091

Subject: Contractual termination and interpretation of dissolution clauses.

The DIFC Court of First Instance considered the former UAE Civil Transactions Law provisions concerning dissolution and the distinction between contractual automatic termination and court-ordered cancellation.

The judgment discussed the significance of an express resolutory condition and the judicial assessment of the seriousness of a breach.

Legal principles:

Contractual termination provisions must be interpreted carefully.

Automatic termination requires sufficiently clear wording.

A judicial termination mechanism allows judicial scrutiny.

A party's ability to cure a breach may be relevant.

The court must distinguish between the applicable legal regimes.

Importance: This decision provides useful guidance for drafting termination clauses in UAE-related international commercial contracts.

DIFC Courts

 

Case-law qualification: Cases 7 and 8 are DIFC decisions, not binding onshore UAE Court of Cassation judgments. They are useful for comparative analysis and for disputes falling within DIFC jurisdiction.

13. Comparison of different termination mechanisms

MechanismLegal basisCourt intervention
Mutual rescissionArticle 233Normally unnecessary
Judicial rescissionArticle 234Required
Automatic rescissionArticle 235No rescission judgment required if validly agreed
Force majeureArticle 236Automatic in complete impossibility
HardshipArticle 224Judicial intervention
RestitutionArticle 237May require judicial determination
Reciprocal withholdingArticle 238May require judicial enforcement

14. Practical applications in UAE commercial transactions

A. Construction agreements

Where a contractor fails to complete a project, the employer may seek performance, judicial rescission or contractual termination depending on the applicable clause and circumstances.

B. Real-estate purchase agreements

Where a developer fails to deliver property, the purchaser may have contractual and statutory remedies. Special emirate-level real-estate legislation and registration requirements must also be considered.

C. Commercial supply agreements

Where a supplier repeatedly fails to deliver goods, the buyer may seek rescission and compensation, subject to notice and the applicable termination provisions.

D. Partnership agreements

Where one partner fails to contribute agreed capital or implement the business arrangement, the other partner may seek rescission and financial restitution.

E. Banking and financial agreements

Termination of a financing agreement may involve repayment obligations, security rights, acceleration provisions and applicable banking legislation.

15. Important legal issues in litigation

When a UAE court considers a rescission or termination dispute, the following questions are particularly important:

Was a valid and binding contract concluded?

What were the precise contractual obligations?

Did a party fail to perform an obligation when it became due?

Was the required notice served?

Does the contract contain an express automatic termination clause?

Was performance impossible or merely more expensive?

Was the breach sufficiently serious to justify rescission?

Did the defaulting party remedy the breach?

What benefits must be returned?

Is additional compensation legally justified?

Evidence generally required

Original contract and amendments.

Payment records and invoices.

Notices of default.

Correspondence between the parties.

Delivery and completion certificates.

Technical expert reports.

Evidence of force majeure.

Evidence of financial loss.

Documents establishing restitution claims.

16. Conclusion

Termination of obligations, rescission and dissolution are essential mechanisms for maintaining contractual fairness and legal certainty within the UAE civil-law system.

The new Civil Transactions Law provides a structured framework:

Article 232 protects the binding force of valid contracts.

Article 233 recognises mutual rescission.

Article 234 provides judicial rescission for non-performance.

Article 235 recognises automatic contractual rescission.

Article 236 regulates force majeure and impossibility.

Article 237 establishes restitution following rescission or termination.

Article 238 protects reciprocal restitution through a right to withhold performance.

The case law demonstrates that termination is not simply a matter of contractual preference. It involves consideration of contractual wording, notice, breach, impossibility, good faith, judicial discretion and the restoration of benefits.

The central principle of UAE civil law is that a valid contractual relationship must be respected until it is extinguished through a legally recognised mechanism, with the consequences of termination determined by the applicable statutory and contractual rules.

Research caution: The cases discussed above largely interpret the repealed 1985 Civil Transactions Law. The new 2025 law applies from 1 June 2026, and Article 4 addresses its temporal application. For a dispute involving a contract concluded or a breach occurring before that date, the applicable transitional rules and relevant facts must be examined rather than automatically applying the new provisions.

 

 

LawGratis provides pro bono legal aid and resources to empower communities. Join us in making justice reachable for everyone! Follow our community on Instagram, YouTube, Facebook, and LinkedIn.