Civil Law And Testamentary Law Wills And Estate Planning In Uae .

1. Introduction

Termination, rescission and dissolution are important legal mechanisms through which contractual relationships come to an end under UAE civil law.

These concepts protect parties when contractual obligations are completed, breached, rendered impossible or affected by legally recognised circumstances.

Although the three concepts may sometimes produce similar practical consequences, they are legally distinguishable.

Termination generally refers to bringing a contractual relationship to an end, particularly for the future.

Rescission generally concerns setting aside a contract because of a legally recognised defect or breach, potentially involving restitution.

Dissolution refers more broadly to the ending of a legal relationship, including certain continuing contracts, partnerships and other arrangements.

In the UAE, these matters must be examined through the Civil Transactions Law, contractual provisions, principles of good faith, judicial interpretation and applicable special legislation.

The central question is:

When can a UAE court terminate, rescind or dissolve a contract, and what happens to the rights, obligations, payments and damages of the parties after the contractual relationship ends?

The subject is particularly important in:

Commercial contracts.

Construction agreements.

Real estate transactions.

Banking and financing agreements.

Employment-related contractual arrangements.

Distribution and agency agreements.

Technology and service contracts.

Partnership and investment arrangements.

2. Applicable UAE Legal Framework

A. Federal Decree-Law No. 25 of 2025 – Civil Transactions Law

The new UAE Civil Transactions Law came into force on 1 June 2026, replacing Federal Law No. 5 of 1985.

It provides the general framework governing contractual relationships and civil obligations.

Its relevant legal principles include:

Formation and validity of contracts.

Binding force of contractual obligations.

Performance in good faith.

Non-performance of contractual obligations.

Compensation for damage.

Impossibility of performance.

Unlawful exercise of rights.

Restitution and consequences of invalid transactions.

Interpretation of contractual provisions.

The distinction between the legal effect of rescission, termination and dissolution must be determined by reference to the applicable statutory provisions and the nature of the particular contract.

B. Contractual freedom

UAE civil law generally allows parties to determine the terms of their contractual relationships within the limits of mandatory law and public order.

Parties may agree upon:

Contract duration.

Termination notice periods.

Events triggering termination.

Cure periods for contractual breaches.

Termination payments.

Compensation mechanisms.

Conditions for renewal.

Consequences of early termination.

A contractual termination clause must nevertheless be interpreted consistently with the applicable law.

C. Good faith

Good faith is a fundamental principle in contractual performance.

A party should not use a termination right abusively or deliberately create circumstances designed to justify terminating an agreement.

For example, a company that intentionally prevents its supplier from performing cannot necessarily rely on the resulting non-performance as justification for termination.

D. Special legislation

The Civil Transactions Law does not operate in isolation.

Depending on the contract, other legislation may apply, including:

Federal Decree-Law No. 50 of 2022 on Commercial Transactions.

Federal Decree-Law No. 33 of 2021 on Regulation of Labour Relations.

Federal Law No. 3 of 2022 regulating commercial agencies.

Applicable real estate legislation in the relevant Emirate.

Federal Decree-Law No. 46 of 2021 on Electronic Transactions and Trust Services.

Special statutory rules may prevail over general civil-law rules where applicable.

3. Statutory Provisions: Articles 232–238 of the New Civil Transactions Law

The most important provisions are found in Part Six – Dissolution of the Contract of Federal Decree-Law No. 25 of 2025.

Key statutory provisions

232

General rule against unilateral rescission

A valid and binding contract cannot ordinarily be revoked, modified or rescinded except by mutual consent, litigation or a provision of law.

233

Mutual rescission (Iqala)

The parties may agree to rescind the contract after its conclusion, subject to the general requirements of a contract.

234

Rescission for breach

In bilateral contracts, a party may seek performance or rescission after notifying the defaulting party.

235

Automatic rescission

Parties may agree that a contract will be automatically rescinded upon non-performance, subject to the statutory notice rule.

236

Force majeure

Impossibility caused by force majeure may result in automatic rescission. Partial and temporary impossibility receive separate treatment.

237

Restoration and compensation

The parties must be restored to their pre-contractual positions following rescission or termination. If restoration is impossible, compensation is awarded.

238

Mutual restitution

Each party may withhold what it received until the other party returns its corresponding performance or provides security for its return.

Source: Federal Decree-Law No. 25 of 2025, official legislative text.

UAE Legislation+1

 

3.1 Article 232 – Binding force of contracts

Article 232 establishes that a valid and binding contract cannot ordinarily be cancelled by one party simply because that party no longer wishes to continue.

The recognised routes are:

Mutual agreement.

Judicial proceedings.

A provision of law.

Example:

A UAE company enters into a five-year commercial supply agreement.

After two years, the company decides that the agreement is no longer commercially beneficial.

It cannot automatically terminate the contract merely because it has changed its business strategy.

It must identify a contractual or statutory right to terminate, obtain the other party's agreement or rely on another legally recognised ground.

3.2 Article 233 – Mutual rescission (Iqala)

Mutual rescission occurs when both parties agree to bring their existing contractual relationship to an end.

It is based on mutual consent.

The important requirements include:

Agreement between the contracting parties.

Compliance with the general conditions governing contracts.

Identification of the obligations being rescinded.

The ability to restore the parties to their original positions for rescission of the entire subject matter.

The parties may also rescind only part of a contract in exchange for the corresponding consideration.

Example:

A developer agrees to sell two commercial units to a buyer.

Before completion, both parties agree that one unit will be retained under the contract while the other unit will be returned against repayment of the corresponding price.

Article 233 provides the framework for such partial mutual rescission.

An important distinction is that mutual rescission has the effect of rescission between the parties, while it constitutes a new contract in relation to third parties.

3.3 Article 234 – Judicial rescission for breach

Article 234 addresses non-performance in bilateral contracts.

The injured party may request:

Specific performance; or

Judicial rescission.

The usual process involves notifying the defaulting party.

The court may:

Order performance.

Grant additional time.

Refuse rescission if the breach is minor in relation to the contract as a whole.

Refuse rescission where the defaulting party has averted it through performance.

Award compensation where justified.

Example:

A construction contractor agrees to complete a commercial building by a specified date.

The contractor fails to complete substantial contractual work despite receiving the agreed payments.

The developer may notify the contractor and seek completion of the work or rescission of the agreement, depending on the circumstances.

The court evaluates the seriousness of the breach and the parties' respective conduct.

3.4 Article 235 – Express automatic rescission

Article 235 allows parties to agree that a contract will be automatically rescinded upon failure to perform contractual obligations.

However, the statutory notice requirement remains applicable unless the parties expressly agree to waive notice.

This provision is important for:

Commercial supply agreements.

Construction contracts.

Distribution agreements.

Real estate transactions.

Financial agreements.

Example:

A supply contract provides that failure to pay an instalment within the specified period will trigger automatic rescission.

The parties must carefully draft the clause, particularly regarding the triggering event, notice and waiver of notice.

A general statement that a party may terminate for breach should not automatically be treated as an express automatic-rescission clause.

3.5 Article 236 – Rescission due to force majeure

Article 236 addresses situations in which performance becomes impossible because of force majeure.

It recognises three situations.

SituationLegal consequence
Total impossibilityCorresponding obligations are extinguished and the contract is automatically rescinded
Partial impossibilityA party may invoke extinguishment of the affected obligation or request judicial rescission
Temporary impossibility in continuing contractsA party may invoke extinguishment, modification or judicial rescission

Example:

A company agrees to supply specialised equipment to a UAE industrial facility.

An extraordinary event makes the agreed supply legally or physically impossible.

If the requirements of Article 236 are satisfied, the corresponding contractual obligations may be extinguished and the contract may be rescinded.

However, increased cost, commercial inconvenience or reduced profitability alone does not necessarily amount to impossibility.

3.6 Article 237 – Restoration of the original position

Article 237 establishes the restitutionary consequences of rescission or termination.

The general objective is to restore both parties to their positions before the contract.

For example:

The buyer returns the purchased property.

The seller refunds the purchase price.

A party returns contractual benefits received.

If restoration is impossible, compensation may be awarded.

3.7 Article 238 – Right to withhold reciprocal restitution

Article 238 provides an important safeguard.

Where both parties are required to return what they received, either party may withhold its own return until the other party performs the corresponding restitution or provides security.

This helps prevent one party from recovering its payment while leaving the other without the benefit or security of its own restitution.

4. Distinction Between Termination, Rescission, Dissolution and Annulment

These concepts should not be treated as interchangeable.

ConceptMeaningTypical legal consequence
TerminationEnding a contractual relationship under an applicable contractual or statutory rightGenerally ends future performance
RescissionSetting aside or bringing a contract to an end on a legally recognised groundMay involve restitution
DissolutionBroader ending of a legal or contractual relationshipDepends on the cause and applicable rules
Mutual rescissionEnding a contract by agreement of both partiesRestitution according to the agreed and statutory framework
AnnulmentSetting aside a contract because of a recognised defect affecting its validityMay involve restoration of benefits
Automatic rescissionRescission resulting from a stipulated event or statutory ruleTakes effect according to the applicable provision

Important legal distinction

The new Civil Transactions Law places rescission and termination together in Article 237 when addressing restoration of the parties' original positions.

However, the legal basis and temporal effects of each remedy may differ.

For example, rescission for breach, automatic rescission following force majeure and termination of a continuing service contract should not automatically be treated as producing identical consequences.

5. Detailed Case Laws on Termination, Rescission and Dissolution in the UAE

The following judgments provide important judicial guidance. Most were decided under the former Civil Transactions Law of 1985, which was replaced on 1 June 2026. Their principles remain useful where consistent with the new legislation, but their statutory references must be updated.

Case 1. Ras Al Khaimah Court of Cassation – Commercial Appeal No. 11 of 16 Judicial Year (2021)

UAE domestic judgment

Subject: Rescission for breach and restoration of contractual positions

Facts:

The dispute involved an agreement for the purchase of 100,000 medical respirator masks.

The buyer alleged that the seller failed to deliver a substantial part of the agreed quantity despite receiving payment.

Legal question:

Could the buyer obtain rescission and recover the corresponding purchase price?

Judicial principle:

The Court reaffirmed that:

Contracts must be performed in good faith.

Non-performance may justify rescission.

Rescission generally restores the parties to their previous positions.

Where restoration is impossible, compensation may be awarded.

The trial court determines whether the breach is sufficiently serious.

The claimant's own conduct and responsibility must also be considered.

The court dismissed the appeal after examining the contractual documents and expert evidence.

Importance under the new law:

The decision is relevant to Articles 234 and 237 of the new Civil Transactions Law.

It demonstrates that a party cannot establish a right to rescission merely by alleging non-performance; the court must examine the actual contractual obligations and evidence.

Polaris Legal Library

 

Case 2. Abu Dhabi Court of Cassation – Commercial Appeal No. 1015 of 2021 (17 November 2021)

UAE domestic judgment

Subject: Rescission of off-plan property sale and refund

Facts:

A buyer entered into an agreement to purchase an off-plan plot of land.

The developer failed to complete essential infrastructure, including roads, utilities, pavements and drainage systems.

The buyer sought rescission, repayment of the purchase price and compensation.

Legal question:

Could the buyer rescind the agreement where the developer failed to provide the infrastructure necessary for delivery?

Judicial principle:

The Court upheld the rescission and compensation awarded to the buyer.

It emphasised that:

Contractual obligations must be performed in good faith.

Failure to perform substantial obligations may justify rescission.

The developer's responsibility is assessed by examining the agreement it signed.

Expert evidence can establish the extent of non-performance.

Compensation may accompany rescission where justified.

Importance under the new law:

This decision is particularly relevant to Articles 234 and 237.

It demonstrates the relationship between contractual performance, judicial rescission, restitution and compensation.

Polaris Legal Library

 

Case 3. Dubai Court of Cassation – General Assembly Appeal No. 5 of 2021 (20 April 2021)

General Assembly judgment

Subject: Binding contractual terms and refusal of rescission

Facts:

A property development agreement concerned the sale of a development plot.

The buyer argued that the developer's failure to complete infrastructure justified rescission.

However, the agreement expressly addressed the possibility that infrastructure might not yet be completed when the plot was handed over.

Legal question:

Could a party obtain rescission despite having accepted contractual conditions relating to incomplete infrastructure?

Judicial principle:

The General Assembly reaffirmed that a valid contract binds the parties and cannot be rescinded merely because one party later becomes dissatisfied with its terms.

The Court examined:

The clear contractual wording.

The parties' common intention.

The buyer's knowledge of the infrastructure conditions.

The parties' respective contractual performance.

The seriousness and relevance of the alleged breach.

It refused rescission because the buyer was found to be the defaulting party under the particular contractual arrangements.

Importance under the new law:

The decision illustrates Article 232's principle that valid and binding contracts cannot be unilaterally rescinded without an appropriate legal basis.

It also demonstrates the importance of examining the entire contract before granting rescission.

Polaris Legal Library

 

Case 4. Dubai Court of Cassation – General Assembly Appeals Nos. 2 and 3 of 2020 (27 January 2021)

General Assembly judgment

Subject: Termination of off-plan property agreements and refund of payments

Facts:

The dispute concerned an off-plan property purchase involving six units in a Dubai development.

The buyer and developer disagreed about termination, the amount that could be retained by the developer and the amount refundable to the buyer.

Legal question:

Could the court determine the appropriate amount retained by the developer following termination?

Judicial principle:

The General Assembly considered Dubai's amended interim real estate registration legislation.

It recognised that the trial court could determine a fair retention amount within the applicable statutory maximum, taking account of the circumstances.

The judgment also addressed the consequences of termination for off-plan agreements and the interaction between statutory termination procedures and contractual obligations.

Importance under UAE law:

This decision demonstrates that termination of real estate contracts is not governed exclusively by general civil-law principles.

Special real estate legislation may establish specific procedures and financial consequences.

The decision is particularly important for understanding the relationship between Article 234 of the new Civil Transactions Law and special Dubai real estate legislation.

Polaris Legal Library

 

Case 5. Ras Al Khaimah Court of Cassation – Civil Appeals Nos. 99 and 101 of 11 Judicial Year (31 August 2016)

UAE domestic judgment

Subject: Dissolution of a company and restitution of contributions

Facts:

Several individuals established an offshore company with a proposed capital of USD 5 million.

One partner contributed his agreed capital contribution, while the other partners failed to provide their contributions.

The planned business never commenced.

The dispute concerned dissolution, recovery of contributions and whether formal liquidation was necessary.

Legal question:

Could the company arrangement be dissolved and the parties restored to their original financial positions without formal liquidation?

Judicial principle:

The Court recognised that:

A company may be dissolved where a partner fails to fulfil an important contribution obligation.

Rescission or annulment may operate retroactively between partners.

Each partner may recover their contribution where the company never actually commenced business.

Formal liquidation may be unnecessary where there are no actual business activities, assets, rights or obligations requiring liquidation.

Importance under the new law:

The judgment is relevant to the distinction between contractual rescission and corporate dissolution.

It illustrates that the consequences of dissolution depend on the legal nature and actual operational status of the entity.

Polaris Legal Library

 

Case 6. DIFC Investments LLC v. Mohammed Akbar Mohammed Zia [2017] DIFC CA 005

DIFC Court of Appeal

Subject: Contractual termination and express termination clauses

Facts:

The parties entered into 72 property sale contracts.

The buyer was required to make payments by specified deadlines.

The agreements contained a clause allowing the seller to terminate if the buyer failed to make the required payments or complete the transfer in accordance with the agreement.

The buyer failed to make the required payment despite extensions.

Legal question:

Could the seller terminate the agreements under the express contractual provision without obtaining a separate judicial rescission order?

Judicial principle:

The DIFC Court of Appeal upheld the termination.

It considered the contractual wording and concluded that the seller was entitled to terminate following the buyer's failure to pay by the extended deadline.

The Court also examined the relevant principles under DIFC law and UAE law, finding that the contractual terms supported termination in either analysis.

Importance for UAE civil law:

The decision is useful for understanding:

Express termination clauses.

Contractual deadlines.

Payment defaults.

Retention of deposits.

The difference between contractual termination and judicial rescission.

Important jurisdictional distinction: This was a DIFC Court of Appeal decision. It must be read in light of the DIFC's governing legal framework and should not be treated as a general ruling that every onshore UAE termination clause operates without judicial intervention.

DIFC Courts

 

Case 7. Access Group DWC LLC and Proex Partners Limited v. BLS International FZE [2023] DIFC CFI 091 (12 November 2025)

DIFC Court of First Instance

Subject: Contract interpretation and termination of commercial service arrangements

Facts:

The proceedings involved contractual arrangements between companies providing visa-processing and related services.

The dispute concerned contractual rights, termination provisions and the consequences of alleged non-performance.

Legal significance:

The judgment discussed the former UAE Civil Transactions Law's provisions concerning contractual dissolution, including the distinction between:

Express automatic termination.

Termination requiring judicial intervention.

Contractual interpretation.

The seriousness of alleged breach.

The opportunity to remedy non-performance.

The judgment is particularly useful for studying how termination provisions are examined in complex commercial relationships.

Importance under the new law:

Its analysis can be compared with Articles 234 and 235 of Federal Decree-Law No. 25 of 2025.

However, its reasoning must be considered in the context of the applicable governing law and the specific contract.

DIFC Courts+1

 

6. Legal Grounds for Termination and Rescission in Different Contract Categories

A. Commercial contracts

Commercial agreements may be terminated or rescinded because of:

Non-payment.

Failure to deliver goods.

Material contractual breach.

Fraud or misrepresentation.

Agreed termination events.

Legally recognised impossibility.

For example, a supplier that repeatedly fails to deliver essential products may face a rescission claim where the breach is sufficiently serious.

B. Construction contracts

Construction agreements frequently contain detailed termination provisions.

Possible grounds include:

Abandonment of work.

Serious construction defects.

Failure to meet contractual milestones.

Non-payment of certified invoices.

Insolvency-related events, subject to applicable law.

Failure to remedy material defaults.

The court may examine project records, payment certificates, engineering reports and contractual correspondence.

C. Real estate contracts

Real estate rescission may arise from:

Failure to deliver property.

Failure to meet essential contractual obligations.

Misrepresentation concerning property.

Failure to complete required infrastructure.

Non-payment by the purchaser.

Breach of special real estate registration requirements.

In Dubai, off-plan termination must also be examined under the applicable real estate legislation, including Dubai Law No. 13 of 2008, as amended.

D. Banking and financing agreements

Financial agreements may contain clauses addressing:

Payment defaults.

Acceleration of repayment.

Events of default.

Security enforcement.

Early termination.

Material breaches of financial covenants.

The enforceability of these provisions depends on the contract, applicable financial legislation and relevant mandatory protections.

E. Technology contracts

Technology and software agreements may be terminated because of:

Repeated service outages.

Serious cybersecurity failures.

Failure to provide contracted services.

Unauthorised disclosure of data.

Material service-level breaches.

For example, a business may seek termination of a cloud-services agreement where the provider repeatedly fails to meet essential contractual availability requirements.

F. Partnership and company agreements

Dissolution may occur because of:

Failure to contribute capital.

Serious misconduct by a partner.

Loss of the company's business purpose.

Contractual dissolution events.

Judicially recognised grounds.

Company dissolution must be distinguished from ordinary contractual termination because company law and liquidation rules may apply.

7. Effects of Termination, Rescission and Dissolution

The legal consequences are not limited to bringing the contract to an end.

They may involve financial and proprietary adjustments.

7.1 Restitution

The parties may be required to return what they received.

Example:

A buyer pays AED 500,000 for a property but the sale is rescinded.

The buyer may be entitled to repayment of the purchase price, subject to the applicable restitutionary rules and any other legally established adjustments.

7.2 Compensation

Compensation may be awarded where the legal requirements are satisfied.

Possible claims include:

Direct financial loss.

Property damage.

Reasonable additional expenses.

Other legally recoverable losses.

7.3 Return of property

Where a contract transfers property and is subsequently rescinded, the parties may need to restore the relevant property rights.

Applicable registration and third-party rights must also be considered.

7.4 Interest and financial adjustments

The court may consider appropriate interest or other financial adjustments where legally justified.

The amount and commencement date depend on the legal basis, contractual terms and judicial findings.

7.5 Third-party rights

Rescission between two contracting parties does not necessarily eliminate rights that have independently arisen in favour of third parties.

Article 233 expressly addresses the effect of mutual rescission on third parties.

7.6 Continuing contractual obligations

Certain provisions may continue to have effect after termination where their nature or contractual wording requires it.

Examples include:

Confidentiality.

Dispute resolution.

Outstanding payment obligations.

Intellectual property restrictions.

Certain indemnity provisions.

8. Judicial Procedure for Obtaining Rescission in the UAE

A party seeking judicial rescission should generally proceed through the following stages.

Examine the contract

Identify the contractual obligations, termination provisions, applicable law and dispute-resolution clause.

Identify the breach

Establish the exact obligation that was not performed and its importance to the contract.

Issue formal notice

Provide the required notice and any applicable opportunity to remedy the breach, unless a valid exception applies.

Collect evidence

Preserve invoices, payment records, correspondence, expert reports and performance records.

File proceedings

Seek judicial performance, rescission or another appropriate remedy before the competent court.

Judicial examination

The court evaluates the breach, the parties' conduct, the applicable statutory provisions and the requested remedy.

Restitution and compensation

Following the relevant decision, the parties' rights and financial positions are adjusted under Articles 237 and 238 where applicable.

Important evidence in rescission proceedings

EvidencePurpose
Signed contractEstablish contractual obligations
Payment receiptsProve financial performance
Formal noticesEstablish notice and default
Emails and correspondenceDemonstrate the parties' conduct
Expert reportsEstablish defects or non-performance
Delivery recordsEstablish performance or failure
Bank statementsVerify payments and outstanding amounts
Registration documentsEstablish property or corporate rights

9. Defences Against Rescission

A defendant may oppose a rescission claim on several grounds.

1. No material breach

The alleged breach is insignificant in relation to the contract as a whole.

2. Performance already completed

The defendant has fulfilled the relevant obligation.

3. Failure to give required notice

The claimant failed to comply with an applicable notice requirement.

4. Claimant's own default

The claimant was itself responsible for preventing or obstructing performance.

5. Contractual authorisation

The contract expressly permitted the conduct complained of.

6. Force majeure

The non-performance resulted from legally recognised impossibility.

7. Waiver or settlement

The claimant has validly waived the right or settled the relevant dispute.

8. Statutory restrictions

A special statutory regime may prescribe different termination procedures or remedies.

10. Difference Between Judicial Rescission and Automatic Rescission

IssueJudicial rescissionAutomatic rescission
Legal basisArticle 234Article 235 or another applicable statutory rule
Court involvementCourt is asked to order rescissionNo separate rescission judgment is required where the clause operates effectively
NoticeGenerally requiredRequired unless expressly waived
Disputed breachJudicially examinedMay subsequently be examined by a court
Minor breachCourt may refuse rescissionContractual and statutory requirements must still be satisfied
CompensationMay be awardedMay still be claimed where legally justified

A particularly important point is that automatic rescission does not prevent subsequent judicial review of whether the contractual trigger actually occurred or whether the clause is legally effective.

11. Critical Legal Issues and Future Developments

Termination and rescission are becoming more complicated as commercial transactions increasingly involve digital and interconnected contractual relationships.

Important emerging issues include:

Automated termination of smart contracts.

Termination of AI-managed commercial agreements.

Digital evidence of contractual default.

Cross-border contractual dissolution.

Termination of cloud-service agreements.

Rescission of tokenised real estate transactions.

Insolvency-related termination restrictions.

Protection of consumers against unfair termination clauses.

The effect of termination on digital assets and third-party rights.

The new UAE Civil Transactions Law provides a general foundation, but special legislation and the governing law of individual contracts remain important.

12. Comparative Legal Position

Legal systemPrincipal approach
UAECivil Transactions Law Articles 232–238 and special legislation
FranceCivil Code provisions on resolution of contracts and contractual non-performance
GermanyGerman Civil Code provisions on withdrawal and termination
England and WalesContractual termination, repudiatory breach and equitable remedies
SingaporeContractual termination, rescission and common-law remedies
DIFCDIFC Contract Law and applicable DIFC legislation

The UAE system is especially significant because it expressly regulates mutual rescission, judicial rescission, automatic rescission, force majeure and restitution within one statutory section.

13. Conclusion

Termination, rescission and dissolution are fundamental mechanisms for protecting contractual rights and maintaining fairness in UAE civil transactions.

The new Federal Decree-Law No. 25 of 2025 provides a particularly important statutory framework through Articles 232–238.

The key legal principles are:

A valid and binding contract cannot ordinarily be unilaterally rescinded.

Parties may mutually agree to rescind their contract.

Material non-performance may justify judicial rescission.

Automatic rescission is possible where the applicable contractual and statutory requirements are satisfied.

Force majeure may result in automatic rescission where performance becomes impossible.

Rescission or termination may require restoration of the parties' original positions.

Compensation may be awarded where restoration is impossible or where other legal requirements justify it.

Special legislation may modify the general civil-law rules.

The decisions in RAK Cassation Commercial 11/16, Abu Dhabi Cassation 1015/2021, Dubai Cassation General Assembly 5/2021, Dubai Cassation General Assembly Appeals 2 and 3 of 2020, RAK Cassation Civil Appeals 99 and 101 of 11 Judicial Year, and DIFC Investments v Mohammed Akbar Mohammed Zia provide important judicial illustrations.

The central principle is that contractual relationships should be brought to an end only through a legally recognised mechanism, with appropriate protection for the rights, payments and legitimate interests of all parties.

Research qualification: The UAE domestic cases discussed above were decided under the repealed 1985 Civil Transactions Law. Their principles should be read alongside the corresponding provisions of the 2025 Law and any relevant subsequent special legislation. The DIFC case is a separate jurisdictional authority.

 

LawGratis provides pro bono legal aid and resources to empower communities. Join us in making justice reachable for everyone! Follow our community on Instagram, YouTube, Facebook, and LinkedIn.

LEAVE A COMMENT